Browse Our Previous Work

SUB-MARINE HARBOR BORE

SUB-MARINE HARBOR BORE

SUB-MARINE HARBOR BORE

  1,200 linear feet of six 6” Electrical Conduits under Freeport Harbor and Marina


21 January 2019 - 26 February 2019

Freeport, NY

SUB-AQUEOUS WATER MAIN

SUB-MARINE HARBOR BORE

SUB-MARINE HARBOR BORE

A 4,750 linear foot push of drill pipe through a failed 24" steel water main


07 October 2019 - 24 October 2019

Providence, RI

GAS TRANSMISSION MAIN

SUB-MARINE HARBOR BORE

HI-WAY INTERSECTION BORE

 National Grid 20” Gas Transmission Main under Interstate 495


25 September 2014 - 14 November 2014

Manorville, NY

HI-WAY INTERSECTION BORE

HIGH TRAFFIC GAS MAIN BORE

HI-WAY INTERSECTION BORE

National Grid 30” Gas Transmission Main Installation under the Belt Parkway Interchange


14 April 2014 - 27 June 2014

Brooklyn-Queens, NY

HIGH TRAFFIC GAS MAIN BORE

HIGH TRAFFIC GAS MAIN BORE

HIGH TRAFFIC GAS MAIN BORE

  8” Steel welded gas main under the entrance to Hofstra University


19 September 2016 - 21 October 2016

Uniondale, NY

CLEANOUTS AND MANHOLES

HIGH TRAFFIC GAS MAIN BORE

HIGH TRAFFIC GAS MAIN BORE

  Forced sewer main, clean-outs, drain manholes, release vaults under highway


06 August 2018 - 14 June 2019

Sayville, NY

Additional Projects

Jericho, NY

South Setauket, NY

Glen Cove, NY

Horizontal directional drill a 14” Fuse-able PVC Raw water line to connect two well sites and eliminate an aging chemical feed system at one of the well sites. The new raw water pipe was to be placed under the sidewalk adjacent to Jericho Turnpike. 

Glen Cove, NY

South Setauket, NY

Glen Cove, NY

Furnish and Install an 18” HDPE Forced Sewer main under the shipping channel and the steel sheeted bulkheads on either side.  The pipe had to be pulled at night to minimize the disruption with traffic and emergency personnel.

South Setauket, NY

South Setauket, NY

South Setauket, NY

Install four 6” HDPE electrical conduits from vault to vault. The 6” conduits were installed under County owned concrete roadways from existing vault to existing vault, in lengths of 800 feet. Very high vehicular traffic caused many delays and conflicts on this project.

Northport, NY

Northport, NY

South Setauket, NY

Horizontal directional drill under the beach along the existing gravity sewer line and install a new HDPE sewer line for future use. 1,810 linear feet of 16” borehole held at a 0.3% slope; one 12” DIPS SDR 11 HDPE Sewer Pipe. Subsurface conditions that were drilled through consisted of a predominantly tight marine clay with overlaying sand and gravel.

New Haven, CT

Northport, NY

New Haven, CT

Horizontal directional drill under Interstate 95, running parallel with the Quinnipiac River. Installation of 820 linear feet of 36” borehole in rock; nine 6” conduits and nine 4” HDPE conduits. The subsurface conditions that were drilled through consisted of dense gneiss.

Copyright © 2024 Hemlock Directional Boring - All Rights Reserved.